S/N | NAME | PROJECT NAME | CLASS OF WORKS AND SPECIALISATIONS CODE, IF ANY | EFFECTIVE DATE |
---|---|---|---|---|
1 | DAKOTA DESIGN (PTY) LTD | FIT-OUT WORKS OF FASHION AVENUE NEW SHOPS AND OLD TERMINAL SHOPS FOR MAURITIUS DUTY FREE PARADISE | BUILDING CONSTRUCTION WORKS (FIT-OUT WORKS ONLY) | 09 January 2020 |
2 | SIEMENS SAS | DESIGN, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF 14MW BATTERY ENERGY STORAGE SYSTEMS FOR THE REPUBLIC OF MAURITIUS | MEP WORKS (ELECTRICAL WORKS ONLY) [E01] | 28 January 2020 |
3 | HARRIBEY CONSTRUCTIONS Océan Indien Ltee | ADAPTATION WORKS FOR 3 VILLAS | BUILDING CONSTRUCTION WORKS | 11 February 2020 |
4 | Frankipile (Mauritius) International Ltd | VICTORIA URBAN TERMINAL - DESIGN, SUPPLY AND INSTALLATION OF THE PILING WORKS | BUILDING CONSTRUCTION WORKS [B03] | 04 June 2020 |
5 | JV Manser Saxon Contracting Ltd/Systems Building Contracting Ltd | MARITIM HOTEL AND SPA UPGRADE-PHASE 2 (LOT A AND LOT C) EXECUTION, TESTING, COMMISSIONING, COMPLETION AND REMEDYING OF ANY DEFECTS TO ELECTRICAL AND ALLIED WORKS | MEP WORKS [E01] | 24 June 2020 |
6 | JV Manser Saxon Contracting Ltd/Systems Building Contracting Ltd | MARITIM HOTEL AND SPA UPGRADE-PHASE 2 (LOT A AND LOT C) EXECUTION, TESTING, COMMISSIONING, COMPLETION AND REMEDYING OF ANY DEFECTS TO MECHANICAL AND ALLIED WORKS | MEP WORKS [E01] | 24 June 2020 |
7 | JV Manser Saxon Contracting Ltd/Systems Building Contracting Ltd | MARITIM HOTEL & SPA UPGRADE-PHASE 2 (LOT A AND LOT C) EXECUTION, TESTING, COMMISSIONING, COMPLETION AND REMEDYING OF ANY DEFECTS TO PUBLIC HEALTH AND ALLIED WORKS | MEP WORKS [E01] | 24 June 2020 |
8 | Sinohydro Corporation Limited | LEGEND HILL-INFRASTRUCTURE WORKS | CIVIL ENGINEERING CONSTRUCTION WORKS [CE06] | 22 July 2020 |
9 | Frankipile (Mauritius) International Ltd | DESIGN, SUPPLY AND INSTALLATION OF GROUND IMPROVEMENT AND PILING WORKS | CIVIL ENGINEERING CONSTRUCTION WORKS | 29 July 2020 |
10 | China Jiangsu Construction Group Corporation | ICONEBENE OFFICES AT EBENE | BUILDING CONSTRUCTION WORKS | 18 August 2020 |
11 | UTL PowereD EPC Services Ltd | EXCHANGE SQUARE PHASE 1A AT EBENE CYBERCITY FOR PSH INVESTMENT LTD NOMINATED SUBCONTRACT-ELECTRICAL AND PUBLIC HEALTH INSTALLATION | MEP WORKS (ELECTRICAL WORKS ONLY) | 18 August 2020 |
12 | SHAN-XI CONSTRUCTION ENGINEERING CO., LTD | CONSTRUCTION OF MAURITIUS JINFEI FIVE-STAR APARTMENT HOTEL PROJECT | CIVIL ENGINEERING CONSTRUCTION WORKS | 08 September 2020 |
13 | SHAN-XI CONSTRUCTION ENGINEERING CO., LTD | CONSTRUCTION OF MAURITIUS JINFEI FIVE-STAR APARTMENT HOTEL PROJECT | BUILDING CONSTRUCTION WORKS | 08 September 2020 |
14 | SHAN-XI CONSTRUCTION ENGINEERING CO., LTD | CONSTRUCTION OF MAURITIUS JINFEI FIVE-STAR APARTMENT HOTEL PROJECT | MEP WORKS | 08 September 2020 |
15 | China Jiangsu Construction Group Corporation | RIVERPARK RESIDENCES - 78 NR APARTMENTS, TWIN TOWN HOUSES & SIMPLEX/TRIPLEX AND CLUB HOUSE | BUILDING CONSTRUCTION WORKS | 08 September 2020 |
16 | UTL PowereD EPC Services Ltd | ICONEBENE OFFICES AT EBENE-SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF ELECTRICAL & ALLIED WORKS | MEP WORKS (ELECTRICAL WORKS ONLY) | 01 October 2020 |
17 | Frankipile (Mauritius) International Ltd | DESIGN AND EXECUTION OF PILING WORKS FOR 4Nr ROTAPILES AT BC4 AND 6Nr CASED AUGER PILES AS PER BILL OF QUANTITIES | CIVIL ENGINEERING CONSTRUCTION WORKS | 09 October 2020 |
18 | Frankipile (Mauritius) International Ltd | RECONSTRUCTION OF BRIDGE AT FLOREAL - AUSTINE BRIDGE | CIVIL ENGINEERING CONSTRUCTION WORKS | 09 October 2020 |
19 | Frankipile (Mauritius) International Ltd | GUNITING ON TERANGA PHASE 2 FOR CIE TAMARIN BLUE'S | CIVIL ENGINEERING CONSTRUCTION WORKS | 09 October 2020 |
20 | Frankipile (Mauritius) International Ltd | DESIGN, SUPPLY AND INSTALLATION OF PILING WORKS-OFFICE BUILDING AT CAUDAN FOR UNITED DOCKS LTD | CIVIL ENGINEERING CONSTRUCTION WORKS | 09 November 2020 |
21 | Frankipile (Mauritius) International Ltd | DESIGN, SUPPLY AND INSTALLATION OF PILING WORKS FOR TELECOMMUNICATION INFRASTRUCTURE AT SURINAM | CIVIL ENGINEERING CONSTRUCTION WORKS | 21 December 2020 |
22 | UTL PowereD EPC Services Ltd | VIVEA EST AT VIVEA BUSINESS PARK, MOKA-EXECUTION, COMPLETION AND REMEDYING OF DEFECTS FOR ELECTRICAL SERVICES INSTALLATION | MEP WORKS (ELECTRICAL WORKS ONLY) | 12 January 2021 |
23 | UTL PowereD EPC Services Ltd | VIVEA EST AT VIVEA BUSINESS PARK, MOKA-EXECUTION, COMPLETION AND REMEDYING OF DEFECTS FOR PUBLIC HEALTH SERVICES INSTALLATION | MEP WORKS (MECHANICAL WORKS ONLY) | 12 January 2021 |
24 | China Jiangsu Construction Group Corporation | PLAZA BOULEVARD AT ROSE HILL -PHASE 1 (COMMERCIAL) | BUILDING CONSTRUCTION WORKS | 18 January 2021 |
25 | SIEMENS SAS | DESIGN, MANUFACTURE, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF 1.5 MW BATTERY ENERGY STORAGE SYSTEMS FOR RODRIGUES ISLAND | MEP WORKS (ELECTRICAL WORKS ONLY) [E01] | 18 January 2021 |
26 | Frankipile (Mauritius) International Ltd | PILING WORKS-WEST 17 | CIVIL ENGINEERING CONSTRUCTION WORKS (PILING WORKS ONLY) | 18 January 2021 |
27 | Frankipile (Mauritius) International Ltd | DESIGN AND EXECUTION OF PILING WORKS - SAINT DENIS BRIDGE AT CHAMAREL - RG 736 | CIVIL ENGINEERING CONSTRUCTION WORKS (PILING WORKS ONLY) | 18 January 2021 |
28 | Sinohydro Corporation Limited | LANDSLIDE/SLOPE STABILITY TREATMENT ALONG B104 ROAD (BAIE DU CAP – CHAMAREL – CASE NOYALE) AT CHAMAREL | CIVIL ENGINEERING CONSTRUCTION WORKS | 20 May 2021 |
29 | Goldox Construction Ltd | REFURBISHMENT OF SHRI ATAL BIHARI VAJPAYEE TOWER (EX-CYBER TOWER 1) - LOT 2, EBENE CYBER CITY | BUILDING CONSTRUCTION WORKS | 01 June 2021 |
30 | KELLER GEOTECHNICS (MAURITIUS) LTD | PILING WORKS FOR W2V PLANT AT RICHE TERRE, MAURITIUS | CIVIL ENGINEERING CONSTRUCTION WORKS | 15 July 2021 |
31 | CCS COMSERVICE (MAURITIUS) Ltd | MOC CONTRACT FOR NEW FIBRE CONNECTIONS FOR BUSINESS ENTERPRISE | CIVIL ENGINEERING CONSTRUCTION WORKS | 15 July 2021 |
32 | CCS COMSERVICE (MAURITIUS) Ltd | MOC CONTRACT FOR NEW FIBRE CONNECTIONS FOR BUSINESS ENTERPRISE | MEP WORKS (ELECTRICAL WORKS ONLY) (TELECOMMUNICATIONS WORKS ONLY) | 15 July 2021 |
33 | CCS COMSERVICE (MAURITIUS) Ltd | PILOT PROJECT MICRO TRENCHING, CIVIL ENGINEERING & OPTICAL FIBRE CONSTRUCTION WORKS IN MAURITIUS | CIVIL ENGINEERING CONSTRUCTION WORKS | 15 July 2021 |
34 | CCS COMSERVICE (MAURITIUS) Ltd | PILOT PROJECT MICRO TRENCHING, CIVIL ENGINEERING & OPTICAL FIBRE CONSTRUCTION WORKS IN MAURITIUS | MEP WORKS (ELECTRICAL WORKS ONLY) (TELECOMMUNICATIONS WORKS ONLY) | 15 July 2021 |
35 | CCS COMSERVICE (MAURITIUS) Ltd | OVERHEAD COPPER NETWORK CLEANING FOR ACCESS NETWORK | MEP WORKS (ELECTRICAL WORKS ONLY) (TELECOMMUNICATIONS WORKS ONLY) | 15 July 2021 |
36 | CCS COMSERVICE (MAURITIUS) Ltd | MICRO TRENCH WORKS (CIVIL WORKS - 20KM) - (CABLING & ASSOCIATED WORKS-20KM) - (SUPPLY OF PIPES-20KM) | CIVIL ENGINEERING CONSTRUCTION WORKS | 15 July 2021 |
37 | CCS COMSERVICE (MAURITIUS) Ltd | MICRO TRENCH WORKS (CIVIL WORKS - 20KM) - (CABLING & ASSOCIATED WORKS-20KM) - (SUPPLY OF PIPES-20KM) | MEP WORKS (ELECTRICAL WORKS ONLY) (TELECOMMUNICATIONS WORKS ONLY) | 15 July 2021 |
38 | CCS COMSERVICE (MAURITIUS) Ltd | ACCELERATED SUBSCRIBERS NEW CONNECTION & MIGRATION WORKS FOR MAURITIUS TELECOM | MEP WORKS (ELECTRICAL WORKS ONLY) (TELECOMMUNICATIONS WORKS ONLY) | 15 July 2021 |
39 | CCS COMSERVICE (MAURITIUS) Ltd | COPPER RECOVERY PROJECT ISLANDWIDE | CIVIL ENGINEERING CONSTRUCTION WORKS | 15 July 2021 |
40 | CCS COMSERVICE (MAURITIUS) Ltd | COPPER RECOVERY PROJECT ISLANDWIDE | MEP WORKS (ELECTRICAL WORKS ONLY) (TELECOMMUNICATIONS WORKS ONLY) | 15 July 2021 |
41 | CCS COMSERVICE (MAURITIUS) Ltd | MOC FOR THE DEPLOYMENT OF FIBER TO THE ENTERPRISE, MOBILE SITES AND INTER-EXCHANGE LINKS IN MAURITIUS | CIVIL ENGINEERING CONSTRUCTION WORKS | 15 July 2021 |
42 | CCS COMSERVICE (MAURITIUS) Ltd | MOC FOR THE DEPLOYMENT OF FIBER TO THE ENTERPRISE, MOBILE SITES AND INTER-EXCHANGE LINKS IN MAURITIUS | MEP WORKS (ELECTRICAL WORKS ONLY) (TELECOMMUNICATIONS WORKS ONLY) | 15 July 2021 |
43 | CCS COMSERVICE (MAURITIUS) Ltd | MULTI-ORDER CONTRACT FOR THE DEPLOYMENT OF FIBRE TO THE ENTERPRISE, MOBILE SITES AND INTEREXCHANGE LINKS IN MAURITIUS | CIVIL ENGINEERING CONSTRUCTION WORKS | 15 July 2021 |
44 | CCS COMSERVICE (MAURITIUS) Ltd | MULTI-ORDER CONTRACT FOR THE DEPLOYMENT OF FIBRE TO THE ENTERPRISE, MOBILE SITES AND INTEREXCHANGE LINKS IN MAURITIUS | MEP WORKS (ELECTRICAL WORKS ONLY) (TELECOMMUNICATIONS WORKS ONLY) | 15 July 2021 |
45 | CCS COMSERVICE (MAURITIUS) Ltd | TRANSFER OF CUSTOMERS VOICE SERVICE ONTO VOIP & RECOVERY OF COPPER MATERIALS | MEP WORKS (ELECTRICAL WORKS ONLY) (TELECOMMUNICATIONS WORKS ONLY) | 15 July 2021 |
46 | CCS COMSERVICE (MAURITIUS) Ltd | MOC FOR THE MAINTENANCE OF MT ACCESS NETWORKS IN MAURITIUS | CIVIL ENGINEERING CONSTRUCTION WORKS | 15 July 2021 |
47 | CCS COMSERVICE (MAURITIUS) Ltd | MOC FOR THE MAINTENANCE OF MT ACCESS NETWORKS IN MAURITIUS | MEP WORKS (ELECTRICAL WORKS ONLY) (TELECOMMUNICATIONS WORKS ONLY) | 15 July 2021 |
48 | CCS COMSERVICE (MAURITIUS) Ltd | MAURITIUS TELECOM FTTH ODN TK ODN PART FRAME PROCUREMENT AGREEMENT | CIVIL ENGINEERING CONSTRUCTION WORKS | 15 July 2021 |
49 | CCS COMSERVICE (MAURITIUS) Ltd | MAURITIUS TELECOM FTTH ODN TK ODN PART FRAME PROCUREMENT AGREEMENT | MEP WORKS (ELECTRICAL WORKS ONLY) (TELECOMMUNICATIONS WORKS ONLY) | 15 July 2021 |
50 | TELECOMMUNICATIONS CONSULTANTS INDIA LIMITED | MOC FOR THE DEPLOYMENT OF FIBER TO THE ENTERPRISE, MOBILE SITES AND INTER-EXCHANGE LINKS IN MAURITIUS | MEP WORKS (ELECTRICAL WORKS ONLY) (TELECOMMUNICATIONS WORKS ONLY) | 15 July 2021 |
51 | TELECOMMUNICATIONS CONSULTANTS INDIA LIMITED | MISCELLANEOUS SUBSCRIBER WORKS IN ALL EXCHANGE AREAS ACROSS THE ISLAND | MEP WORKS (ELECTRICAL WORKS ONLY) (TELECOMMUNICATIONS WORKS ONLY) | 15 July 2021 |
52 | TELECOMMUNICATIONS CONSULTANTS INDIA LIMITED | CONTRACT FOR SINGLE MODE OPTICAL FIBRE NETWORK EMERGENCY REPAIR AT SHORT NOTICE IN MAURITIUS | MEP WORKS (ELECTRICAL WORKS ONLY) (TELECOMMUNICATIONS WORKS ONLY) | 15 July 2021 |
53 | TELECOMMUNICATIONS CONSULTANTS INDIA LIMITED | MOC FOR THE MAINTENANCE OF MT ACCESS NETWORKS IN MAURITIUS | MEP WORKS (ELECTRICAL WORKS ONLY) (TELECOMMUNICATIONS WORKS ONLY) | 15 July 2021 |
54 | BRINK’S (MAURITIUS) LTD | SUPPLY, INSTALLATION, TESTING, COMMISSIONING AND MAINTENANCE OF A CENTRALISED CCTV SURVEILLANCE SYSTEM | MEP WORKS (ELECTRICAL WORKS ONLY) | 27 July 2021 |
55 | BRINK’S (MAURITIUS) LTD | SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF CCTV SYSTEM AT MOKA DETENTION CENTRE | MEP WORKS (ELECTRICAL WORKS ONLY) | 27 July 2021 |
56 | BRINK’S (MAURITIUS) LTD | SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF CCTV SYSTEM AT PORT LOUIS SOUTH DETENTION CENTRE | MEP WORKS (ELECTRICAL WORKS ONLY) | 27 July 2021 |
57 | BRINK’S (MAURITIUS) LTD | SUPPLY, INSTALLATION, TESTING, COMMISSIONING OF IP CLOSED CIRCUIT TELEVISION (CCTV) SURVEILLANCE SYSTEM AT LADY SUSHIL RAMGOOLAM RECREATION CENTRE, POINTE AUX PIMENTS | MEP WORKS (ELECTRICAL WORKS ONLY) | 27 July 2021 |
58 | BRINK’S (MAURITIUS) LTD | SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF CCTV SYSTEM AT VACOAS DETENTION CENTRE | MEP WORKS (ELECTRICAL WORKS ONLY) | 27 July 2021 |
59 | BRINK’S (MAURITIUS) LTD | SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF CCTV SYSTEM AT PASSPORT AND IMMIGRATION OFFICE | MEP WORKS (ELECTRICAL WORKS ONLY) | 27 July 2021 |
60 | BRINK’S (MAURITIUS) LTD | SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF IP CCTV SURVEILLANCE SYSTEMS AT VACOAS DETENTION CENTRE | MEP WORKS (ELECTRICAL WORKS ONLY) | 27 July 2021 |
61 | KELLER GEOTECHNICS (MAURITIUS) LTD | BEAU PLAN THE STRAND OFFICES AT BEAU PLAN, PAMPLEMOUSSES - PILING WORKS | CIVIL ENGINEERING CONSTRUCTION WORKS | 08 August 2021 |
62 | China Jiangsu Construction Group Corporation | BEAU PLAN THE STRAND | BUILDING CONSTRUCTION WORKS | 01 September 2021 |
63 | BRINK’S (MAURITIUS) LTD | SUPPLY AND INSTALLATION OF CCTV - LE VALENTINA MALL AT PHOENIX | MEP WORKS (ELECTRICAL WORKS ONLY) | 22 September 2021 |